DINGOLFING (July 1, 2026) – BMW’s new 7 Series Sedan began production today at BMW Group Plant Dingolfing — the first time Neue Klasse innovations have appeared in an established production model. Plant Director Christoph Schröder called it proof of Dingolfing’s strength: blending advanced industrial manufacturing with hands-on craftsmanship. BMW plans to roll out Neue Klasse tech across 40 models by the end of 2027.

More tech, more luxury, more choice
The update is BMW’s most extensive ever, adding a new design language, centralized software/electronics architecture, the new Panoramic iDrive display, a Passenger Screen, and an upgraded rear Theatre Screen. BMW Symbiotic Drive improves coordination between driver and assistance systems.

New sixth-generation round-cell batteries boost range and charging speed — the electric i7 60 xDrive reaches 727 km (WLTP) and charges 10–80% in about 28 minutes (energy consumption: 20.8 kWh/100 km; CO₂: 0 g/km; class A; range: 608–727 km, all WLTP). Buyers can also choose from 500+ paint options and roughly 700 interior combinations.

Craftsmanship meets automation
A new dual-finish paint process — combining matte and gloss on one body, an industry first — took 2.5 years to develop and needs over 4,500 minutes of work per car, including 2,000 minutes done by hand. Interior production pairs AI (for leather inspection and cutting) with skilled sewing technicians and a 3D sewing robot.

Flexible, shared production line
The 7 Series is built in Assembly Hall 52 alongside the 5 Series and iX, with all drivetrains — petrol, diesel, plug-in hybrid, electric — assembled on one flexible line. Several processes were updated to support the new electronics and screen components.

Investment and quality
BMW invested a double-digit million-euro sum across Dingolfing and nearby Landshut, which supplies components like axles, motors, cockpit elements, and cast parts. Every vehicle undergoes automated and AI-monitored testing, plus a mandatory real-world road test.

Renewable-powered production
All purchased electricity is renewable, supplemented by an 11 MWp rooftop solar system (since late 2025) and a new biomass heating plant supplying up to 100,000 MWh/year — covering about half the plant’s heat needs.